Reconstruction of the main lecture hall of the Faculty of Dental Medicine
Facts and Figures
Client
University of Medicine
Construction period
10.2014 – 04.2015
Location
Tirana, Albania
Investment type
Public
Project overview
1. Demolition works
Demolition and dismantling of the existing podium.
Dismantling and removal of existing doors.
Demolition of plaster damaged by moisture.
Removal of old electrical installations.
Dismantling and reinstallation of radiators.
2. Construction works
Construction of brick walls with a thickness of 20 cm.
Plastering of the new brick walls.
Wall waterproofing with liquid bitumen for moisture protection.
Construction of simple metal structures.
Installation of 25 mm thick seasoned wooden flooring.
Installation of laminate flooring.
Carpet installation for flooring.
Construction of a false ceiling with plasterboard.
Wall cladding with moisture-resistant plasterboard.
Column cladding with moisture-resistant plasterboard.
Column cladding with laminate.
Wall cladding with MDF.
Installation of internal MDF wooden doors with wooden frames and secret locks.
Ceiling painting with self-drying hydromat paint.
Interior wall painting with hydro plastic paint.
3. Mechanical installations
Installation of seamless steel pipes (Mannesmann).
Installation of armaflex for seamless steel pipes.
Installation of PP-R pipes with a diameter of 25x4.2 mm.
Installation of ball valves and water filters DN 3/4, PN 16 bar.
Installation of DN 40 anti-vibration joints.
Installation of thermometers and pressure gauges for monitoring.
Installation of air release valves and flow switches.
Installation of aluminum foil cladding with a thickness of 0.4 mm for steel pipes connected to the chiller on the terrace.
Installation of PVC pipes with diameters ranging from 25 mm to 50 mm.
Installation of galvanized sheet metal air ducts.
Installation of thermal insulation with industrial aluminum-coated cotton wool, 25 mm thick.
Installation of anti-vibration couplings.
Installation of insulated flexible ducts with a diameter of 150 mm.
4. Electrical installations
Installation of copper cables with PVC insulation and sheathing, type FG7O-R, with cross-sections S=4x16 mm² and S=4x10 mm².
Installation of electric cables with PVC sheathing, type FR-OR, with cross-sections S=3x2.5 mm² and S=3x1.5 mm².
Installation of self-extinguishing flexible PVC pipes, plastic cable ducts 90/60 mm, schuko sockets, and accessories for switches and sockets.
Installation of a 42 HU rack with network accessories, including FTP-cat6 patch cords, a 24-port RJ-45 patch panel, and two fiber optic ports.
Installation of cable management systems and a fan group with 2 fans for the rack.
Installation of FTP-cat6 LSZH computer network cables and UTP-cat5 LSZH telephone network cables.
Installation of HDMI cables and computer and telephone outlets.
Installation of RG-59 PVC-insulated cables, smoke and heat detectors, and fire alarm push buttons with glass break, Type 1469, IP-65.
5. Furniture and equipment
Supply and installation of furniture such as MDF modular desks, podium, and chairs.
Installation of a fresh air recuperator with cooling/heating water batteries.
Installation of Chillers and Fan Coils for air conditioning.
Installation of fluorescent lights, spot incasso, and IP cameras 1.3 Megapixel CMOS ICR Infrared Network Bullet Cameras.
Installation of speakers, power amplifiers (Inter-M), and a microphone.