Within the project for the reconstruction of garden no. 18, a series of necessary works have been carried out to improve its structure and functionality. Works include:

A - Construction works

A-1 Excavation and demolition works
A-2 Masonry works
A-3 Construction works
A-4 Terrace works
A-5 Refinishing and layering works
A-6 Window and door works

B- Hydro sanitary installations

B-1 Sanitary equipment
B-2 Water supply inside the building
B-3 Cold water supply outside the building

C- Sewerage works

C-1 Exhaust installations inside the building
C-2 Drainage installations outside the building (including rainwater)

D- Electrical works

D-1 Electrical equipment
D-2 Electrical installations:

  • Power, lighting and signaling system
  • Electrical panels
  • Fire alarm system
  • Signage and indexing code

E- Works for the heating system

E-1 Space heating
E-2 Technical room