Reconstruction and floor addition in kindergarten no. 13
Project overview
In the framework of the project for the reconstruction and additional floor in kindergarten no. 13, a series of necessary works have been carried out to improve its structure and functionality. Works include:
1- Internal demolition works
- Demolition of brick wall with cleaning.
- Sole damage.
- Foundation damage.
- Remove existing window.
- Remove existing doors.
2- General construction works
- Excavation and transport of soil up to 10m deep.
- Pouring, leveling and filling with soil.
- Gravel layer on the territory of buildings.
- Concrete construction for foundation and beams.
- Brick wall with 6 holes, 25.12 cm thick and 3 m high, mixed mortar M15.
- Various installations and insulations for lighting, water and ventilation.
- Laminate flooring, with ordinary granulated tiles 30 x 30 cm, with majolica tiles, with marble tiles.
3- Facades works and cladding
- Internal and external plastering.
- Coating with waterproofing and thermal insulation material.
- Installation of new windows and doors.
- Painting with plastic and hydro plastic paint of walls and ceilings.
4- Works for systematization of the square
- Gravel and sand layer for sidewalks and squares.
- Placing concrete curbs.
- Simple and composite metal construction.
- Filling and leveling of the terrain for fencing and tiling.
5- Electrical, hydro sanitary, heating, fire protection works
- Electrical works that include electrical, computer, telephone, intercom, TV, fire protection, and lightning protection system installations.
- Plumbing installations including mains water supply and sanitary water distribution system, sewage and rainwater drainage system, automatic water pumping station.
- Installation of the heating system (radiators).
- Installation of the fire protection system.