In the framework of the project for the reconstruction and additional floor in kindergarten no. 13, a series of necessary works have been carried out to improve its structure and functionality. Works include:

1- Internal demolition works

  • Demolition of brick wall with cleaning.
  • Sole damage.
  • Foundation damage.
  • Remove existing window.
  • Remove existing doors.

2- General construction works

  • Excavation and transport of soil up to 10m deep.
  • Pouring, leveling and filling with soil.
  • Gravel layer on the territory of buildings.
  • Concrete construction for foundation and beams.
  • Brick wall with 6 holes, 25.12 cm thick and 3 m high, mixed mortar M15.
  • Various installations and insulations for lighting, water and ventilation.
  • Laminate flooring, with ordinary granulated tiles 30 x 30 cm, with majolica tiles, with marble tiles.

3- Facades works and cladding

  • Internal and external plastering.
  • Coating with waterproofing and thermal insulation material.
  • Installation of new windows and doors.
  • Painting with plastic and hydro plastic paint of walls and ceilings.

4- Works for systematization of the square

  • Gravel and sand layer for sidewalks and squares.
  • Placing concrete curbs.
  • Simple and composite metal construction.
  • Filling and leveling of the terrain for fencing and tiling.

5- Electrical, hydro sanitary, heating, fire protection works

  • Electrical works that include electrical, computer, telephone, intercom, TV, fire protection, and lightning protection system installations.
  • Plumbing installations including mains water supply and sanitary water distribution system, sewage and rainwater drainage system, automatic water pumping station.
  • Installation of the heating system (radiators).
  • Installation of the fire protection system.