Guesthouse construction

Facts and Figures

Project overview

As part of the project for the construction of a 2-story guesthouse with an attic and 1 underground floor in Mat, a series of works have been carried out as follows:

A. Construction works

  • Demolition works.
  • Excavation works.
  • Concrete and reinforced concrete works.
  • Iron works.
  • Masonry works.
  • Roofing and waterproofing works.
  • Plastering and coating works.
  • Layer works.
  • Marble works.
  • Door and window works.
  • Painting works.

B. Electrical works

  • Distribution cables.
  • Installation of the power and lighting system.
  • Computer and telephone network installation.
  • Main electrical panel.

C. Hydro sanitary works

  • Water supply from the network.
  • Water supply distribution network inside the facility.
  • Installation of the hydraulic system in the common sanitary and fire protection technical environments.
  • Installation of internal and external wastewater discharges to wells.

D. Boiler heating system

  • Installation of the distribution network of black steel pipes.
  • Installation of UNI EN 1057 copper pipe network.
  • Installation of the technical environment for hot water production.

E. Fire protection system

  • Distribution of pipelines.
  • Signaling board and hydrant switch.

F. Equipment and furniture

  • Installation of sanitary equipment and water supply system.
  • Installation of equipment for the fire protection system.
  • Installation of equipment for the heating system.
  • Furniture for the whole environment of the guesthouse, such as sofas, armchairs, chairs, tables, carpets, counters, beds, paintings, etc.
  • Equipment for the restaurant and kitchen, such as television, computer, professional cooking stove, professional refrigerator, professional dishwasher, cooking equipment set, etc.