Guesthouse construction
Project overview
As part of the project for the construction of a 2-story guesthouse with an attic and 1 underground floor in Mat, a series of works have been carried out as follows:
A. Construction works
- Demolition works.
- Excavation works.
- Concrete and reinforced concrete works.
- Iron works.
- Masonry works.
- Roofing and waterproofing works.
- Plastering and coating works.
- Layer works.
- Marble works.
- Door and window works.
- Painting works.
B. Electrical works
- Distribution cables.
- Installation of the power and lighting system.
- Computer and telephone network installation.
- Main electrical panel.
C. Hydro sanitary works
- Water supply from the network.
- Water supply distribution network inside the facility.
- Installation of the hydraulic system in the common sanitary and fire protection technical environments.
- Installation of internal and external wastewater discharges to wells.
D. Boiler heating system
- Installation of the distribution network of black steel pipes.
- Installation of UNI EN 1057 copper pipe network.
- Installation of the technical environment for hot water production.
E. Fire protection system
- Distribution of pipelines.
- Signaling board and hydrant switch.
F. Equipment and furniture
- Installation of sanitary equipment and water supply system.
- Installation of equipment for the fire protection system.
- Installation of equipment for the heating system.
- Furniture for the whole environment of the guesthouse, such as sofas, armchairs, chairs, tables, carpets, counters, beds, paintings, etc.
- Equipment for the restaurant and kitchen, such as television, computer, professional cooking stove, professional refrigerator, professional dishwasher, cooking equipment set, etc.