Construction of the sewage network

Facts and Figures

Project overview

Within the project for the construction of the wastewater network in the city of Burrel, a series of works have been carried out as follows:

  1. Excavation of soil with an excavator, in channels with a width of up to 2 m, ordinary soil, with unloading in the vehicle.
  2. Sand layer.
  3. Gravel substrate.
  4. Backfilling, compaction with gravel.
  5. Gravel layer t=20 cm, spread and compacted by machine.
  6. Supply and placement of protection for the realization of collector excavations.
  7. Supply and installation of ribbed HDPE pipe with a diameter of 250 mm for connecting flats.
  8. Supply and installation of ribbed HDPE pipes SN8 Dn=600 mm.
  9. Supply and installation of ribbed HDPE pipes SN8 Dn=500 mm.
  10. Supply and installation of ribbed HDPE pipes SN8 Dn=400 mm.
  11. Supply and installation of ribbed HDPE pipes SN8 Dn=315 mm.
  12. Construction of concrete wells D 1.0m; H(1.5-2.5) m, H(2.5-3.0) m.
  13. Concrete C 20/25 for the pouring portal.