Construction of Bedri Llagami school
Project overview
Within the project for the construction of the Bedri Llagami school in Vaqarr, Tirana, a series of works have been carried out as follows:
A. Demolition works
- Damage to the concrete layer.
- Demolition of reinforced concrete slabs.
- Demolition of columns, reinforced concrete beams, brick wall.
B. Construction works
- Excavation and earthworks.
- Masonry works.
- Concrete and reinforced concrete works.
- Layer works.
- Plastering and coating works.
- Door and window works.
- Works for verandas.
- Unusable terrace work.
- Painting works.
C. External systems and enclosure
- Works for external stairs.
- Works for paving the yard with washed concrete.
- Greenery works.
- Fence works.
D. Sports field works
- Multifunctional field.
- Mini football field.
E. Electrical works
- Power supply, switches and plugs.
- Emergency lighting.
- Fire detection.
- Audio system.
- Grounding.
F. Mechanical installations
- Fire protection system.
- Sanitary hot water system.
- Wastewater and rainwater discharge system.
- The radiator heating system and the technical environment of the heating plant.
G. Installation of equipment
- Supply and installation of equipment for external systems such as basketball backboards, posts for their support, volleyball nets and posts for their support, mini gates for football, auditorium seats.
- Supply and installation of electrical equipment.
- Supply and installation of mechanical equipment (water sanitation, heating, fire protection).