Construction of Bedri Llagami school

Facts and Figures

Project overview

Within the project for the construction of the Bedri Llagami school in Vaqarr, Tirana, a series of works have been carried out as follows:

A. Demolition works

  • Damage to the concrete layer.
  • Demolition of reinforced concrete slabs.
  • Demolition of columns, reinforced concrete beams, brick wall.

B. Construction works

  • Excavation and earthworks.
  • Masonry works.
  • Concrete and reinforced concrete works.
  • Layer works.
  • Plastering and coating works.
  • Door and window works.
  • Works for verandas.
  • Unusable terrace work.
  • Painting works.

C. External systems and enclosure

  • Works for external stairs.
  • Works for paving the yard with washed concrete.
  • Greenery works.
  • Fence works.

D. Sports field works

  • Multifunctional field.
  • Mini football field.

E. Electrical works

  • Power supply, switches and plugs.
  • Emergency lighting.
  • Fire detection.
  • Audio system.
  • Grounding.

F. Mechanical installations

  • Fire protection system.
  • Sanitary hot water system.
  • Wastewater and rainwater discharge system.
  • The radiator heating system and the technical environment of the heating plant.

G. Installation of equipment

  • Supply and installation of equipment for external systems such as basketball backboards, posts for their support, volleyball nets and posts for their support, mini gates for football, auditorium seats.
  • Supply and installation of electrical equipment.
  • Supply and installation of mechanical equipment (water sanitation, heating, fire protection).