Reconstruction of internal roads in Vorë hill district

Facts and Figures

Project overview

Summary of the works carried out in the project of reconstruction of internal roads in the Kodër Vorë neighborhood, with a total length of 511 m:

1. Excavation and road filling works

The works began with the excavation of the soil with an excavator, preparing the ground for filling with previously excavated rock. This process provided a solid foundation for further layers of construction.

2. Works on curbs, gutters and walls

Monolithic structures were built in concrete with composition C 6/10, 16/20 and 20/25, ensuring stability and durability. A 10 cm layer of river gravel was placed to improve drainage and the aesthetics of curbs and gutters.

3. Sidewalk works

Pavement layers were carefully constructed, including:

  • River gravel layer (t=20 cm)
  • Brick layer (t=10 cm)
  • Granite layer under the tiles (t=6 cm)
  • Colored cement tiles, with dimensions 20x20 cm and 25x25 cm.

4. Water pipes

Water works included:

  • The supply and installation of water supply pipes PE d=90 mm, Pn 16, and pipes PE100, PN10, DN 75 mm.
  • Placement of rolling shutters and hydrants with a diameter of 50 mm, as well as distribution wells with dimensions of 1x1x1.35 m.

5. Road lighting works

The existing power lines were relocated and installed:

  • PVC pipes with diameters of 160 mm and 100 mm.
  • Flexible tube with a diameter of 63 mm.
  • Al power cables 1000V, with rubber insulation and plastic cover, including decorative lighting poles H=5.5 m and VISTA SAP-TS100W type lighting.

6. Road demolition works

Work was carried out to demolish the existing concrete walls to improve the road infrastructure.

7. Road paving works

The road layers included:

  • Brick layer (t=15 cm)
  • River gravel layer (t=20 cm)
  • Binder layer with granite gravel (6 cm)
  • Asphalt concrete layer (4 cm)
  • Lines of different widths for marking the road.

8. Construction of the sewage canal

For the construction of the canal, the following were carried out:

  • Excavation of the soil and placement of the sand layer.
  • Supply and installation of 200 mm diameter ribbed pipes.
  • Construction of rain wells and reinforced concrete wells, with cast iron covers and dimensions of 1 m diameter and 1-1.5 m high.